SAP 07-599-56 - Ceresco T-76 over Perch Creek (Bridge 07597)M-K BRIDGE CONSTRUCTION INC. STRUCTURAL SPECIALTIES INC. ICON Constructors, LLC 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$21,970.00$21,970.00$40,000.00$40,000.00$50,100.00$50,100.00
2101.502CLEARINGTREE10$25.00$250.00$25.00$250.00$25.00$250.00
2101.507GRUBBINGTREE10$25.00$250.00$25.00$250.00$25.00$250.00
2105.501COMMON EXCAVATION (P)CU YD176$4.00$704.00$4.00$704.00$4.00$704.00
2105.523COMMON BORROW (EV)CU YD4,487$4.00$17,948.00$4.00$17,948.00$4.00$17,948.00
2105.535SALVAGED TOPSOIL (EV)CU YD1,194$4.00$4,776.00$4.00$4,776.00$4.00$4,776.00
2105.550SUBSOILINGACRE1$500.00$500.00$500.00$500.00$500.00$500.00
2118.501AGGREGATE SURFACING CLASS 1 MODTON570$19.50$11,115.00$19.50$11,115.00$19.50$11,115.00
2401.501STRUCTURAL CONCRETE (3Y43) (P)CU YD54$600.00$32,400.00$612.00$33,048.00$950.00$51,300.00
2401.512BRIDGE SLAB CONCRETE (3Y33A) (P)SQ FT2,505$22.00$55,110.00$28.00$70,140.00$26.00$65,130.00
2401.541REINFORCEMENT BARS (EPOXY COATED) (P)POUND18,070$1.10$19,877.00$1.25$22,587.50$1.40$25,298.00
2401.601SLOPE PREPARATIONLUMP SUM1$4,000.00$4,000.00$2,500.00$2,500.00$7,500.00$7,500.00
2401.601STRUCTURE EXCAVATIONLUMP SUM1$7,500.00$7,500.00$9,500.00$9,500.00$15,000.00$15,000.00
2402.584STRUCTURAL TUBE RAILING DESIGN SPECIAL (P)LIN FT164$90.00$14,760.00$155.00$25,420.00$227.00$37,228.00
2402.590ELASTOMERIC BEARING PAD TYPE 1 (P)EACH12$150.00$1,800.00$125.00$1,500.00$250.00$3,000.00
2405.502PRESTRESSED CONCRETE BEAMS 27M (P)LIN FT488$195.00$95,160.00$222.00$108,336.00$225.00$109,800.00
2442.501REMOVE EXISTING BRIDGELUMP SUM1$20,000.00$20,000.00$38,000.00$38,000.00$50,000.00$50,000.00
2452.507C-I-P CONCRETE PILING DELIVERED 12"LIN FT480$20.00$9,600.00$23.00$11,040.00$35.00$16,800.00
2452.508C-I-P CONCRETE PILING DRIVEN 12"LIN FT480$1.00$480.00$1.00$480.00$2.00$960.00
2452.519C-I-P CONCRETE TEST PILE 70 FT LONG 12"EACH2$8,000.00$16,000.00$8,200.00$16,400.00$12,000.00$24,000.00
2502.601DRAINAGE SYSTEM TYPE (B911)LUMP SUM1$1,000.00$1,000.00$1,700.00$1,700.00$3,500.00$3,500.00
2511.501RANDOM RIPRAP CLASS IVCU YD472$55.00$25,960.00$79.00$37,288.00$70.00$33,040.00
2573.502SILT FENCE, TYPE MACHINE SLICEDLIN FT1,000$2.10$2,100.00$2.10$2,100.00$1.75$1,750.00
2573.505FLOTATION SILT CURTAIN TYPE MOVING WATERLIN FT100$21.00$2,100.00$21.00$2,100.00$20.00$2,000.00
2573.512TEMPORARY DITCH CHECK TYPE 2LIN FT36$6.50$234.00$6.50$234.00$6.00$216.00
2573.513TEMPORARY DITCH CHECK TYPE 7CU YD5$60.00$300.00$125.00$625.00$85.00$425.00
2573.520SEDIMENT REMOVAL BACKHOEHOUR2$200.00$400.00$100.00$200.00$150.00$300.00
2573.530STORM DRAIN INLET PROTECTIONEACH1$500.00$500.00$200.00$200.00$300.00$300.00
2573.540FILTER LOG TYPE STRAW BIOROLLLIN FT550$3.50$1,925.00$3.50$1,925.00$5.00$2,750.00
2573.550EROSION CONTROL SUPERVISORLUMP SUM1$500.00$500.00$1,500.00$1,500.00$1,000.00$1,000.00
2573.602TEMPORARY SEDIMENT TRAPEACH1$200.00$200.00$500.00$500.00$500.00$500.00
2575.501SEEDINGACRE4$200.00$800.00$200.00$800.00$500.00$2,000.00
2575.502SEED MIXTURE 280POUND121$5.00$605.00$5.00$605.00$4.00$484.00
2575.502SEED MIXTURE 150POUND40$4.00$160.00$4.00$160.00$5.00$200.00
2575.511MULCH MATERIAL TYPE 1TON7$225.00$1,575.00$225.00$1,575.00$200.00$1,400.00
2575.519DISK ANCHORINGACRE2$125.00$250.00$125.00$250.00$200.00$400.00
2575.523EROSION CONTROL BLANKETS CATEGORY 4SQ YD130$4.00$520.00$4.00$520.00$3.00$390.00
2575.523EROSION CONTROL BLANKETS CATEGORY 3SQ YD200$3.00$600.00$3.00$600.00$2.50$500.00
2575.532FERTILIZER TYPE 1POUND850$0.80$680.00$1.00$850.00$3.00$2,550.00
2575.560HYDRAULIC SOIL STABILIZER TYPE 5POUND1,050$1.40$1,470.00$1.40$1,470.00$1.50$1,575.00
 Totals for project SAP 07-599-56 $376,079.00 $469,696.50 $546,939.00
 
Contract Total:$376,079.00$469,696.50$546,939.00