SAP 007-605-015 - CSAH 5 Old Bridge #07526, #7239, #7240 RehabilitationICON Constructors, LLC LS Black Constructors 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS1$30,000.00$30,000.00$38,150.00$38,150.00
2021.501MOBILIZATIONLS1$30,000.00$30,000.00$56,680.00$56,680.00
2021.501MOBILIZATIONLS1$30,000.00$30,000.00$38,150.00$38,150.00
2101.502CLEARINGTREE93$120.00$11,160.00$272.50$25,342.50
2101.507GRUBBINGTREE97$85.00$8,245.00$218.00$21,146.00
2104.501REMOVE FENCEL F500$2.00$1,000.00$6.54$3,270.00
2104.501REMOVE GUARDRAILL F1,070$6.50$6,955.00$7.09$7,586.30
2104.503REMOVE BITUMINOUS PAVEMENTS F2,092$1.10$2,301.20$1.36$2,845.12
2104.513SAWING BITUMINOUS PAVEMENTL F196$4.10$803.60$4.91$962.36
2105.501COMMON EXCAVATION (P)C Y344$24.00$8,256.00$38.15$13,123.60
2105.523COMMON BORROW (CV) (P)C Y1,900$14.00$26,600.00$20.71$39,349.00
2118.501AGGREGATE SURFACING CLASS 2TON40$39.50$1,580.00$34.34$1,373.60
2211.501AGGREGATE BASE CLASS 5TON375$20.50$7,687.50$24.53$9,198.75
2221.501SHOULDER BASE AGGREGATE CLASS 1 MODTON43$40.00$1,720.00$60.50$2,601.50
2232.501MILL BITUMINOUS SURFACE (2.0")S Y4,050$2.30$9,315.00$2.18$8,829.00
2357.502BITUMINOUS MATERIAL FOR TACK COATGAL374$2.50$935.00$2.34$875.16
2360.501TYPE SP 12.5 WEARING COURSE MIX (2,C)TON871$88.00$76,648.00$82.84$72,153.64
2401.501STRUCTURAL CONCRETE (3B52) (P)C Y5$1,500.00$7,500.00$1,798.50$8,992.50
2401.501STRUCTURAL CONCRETE (3B52) (P)C Y4$1,500.00$6,000.00$1,798.50$7,194.00
2401.541REINFORCEMENT BARS (EPOXY COATED) (P)LB8,880$2.00$17,760.00$1.58$14,030.40
2401.541REINFORCEMENT BARS (EPOXY COATED) (P)LB14,010$2.00$28,020.00$1.58$22,135.80
2401.541REINFORCEMENT BARS (EPOXY COATED) (P)LB16,370$2.00$32,740.00$1.58$25,864.60
2401.601STRUCTURE EXCAVATIONLS1$5,000.00$5,000.00$5,995.00$5,995.00
2401.601STRUCTURE EXCAVATIONLS1$5,000.00$5,000.00$3,815.00$3,815.00
2401.601STRUCTURE EXCAVATIONLS1$5,000.00$5,000.00$5,995.00$5,995.00
2401.618BRIDGE SLAB CONCRETE (3YHPC-M) (P)S F1,611$40.00$64,440.00$41.42$66,727.62
2401.618BRIDGE SLAB CONCRETE (3YHPC-M) (P)S F1,200$40.00$48,000.00$41.42$49,704.00
2401.618BRIDGE SLAB CONCRETE (3YHPC-M) (P)S F738$40.00$29,520.00$41.42$30,567.96
2402.584STRUCTURAL TUBE RAILING DESIGN SPECIAL (P)L F34$249.00$8,466.00$355.34$12,081.56
2402.584STRUCTURAL TUBE RAILING DESIGN SPECIAL (P)L F62$249.00$15,438.00$355.34$22,031.08
2402.584STRUCTURAL TUBE RAILING DESIGN SPECIAL (P)L F59$249.00$14,691.00$355.34$20,965.06
2433.601TEMPORARY STRUCTURAL SUPPORTLS1$25,000.00$25,000.00$19,620.00$19,620.00
2433.601TEMPORARY STRUCTURAL SUPPORTLS1$25,000.00$25,000.00$14,170.00$14,170.00
2433.601TEMPORARY STRUCTURAL SUPPORTLS1$25,000.00$25,000.00$19,075.00$19,075.00
2433.602GROUTED REINFORCEMENT BARS (P)EACH90$75.00$6,750.00$59.95$5,395.50
2433.602GROUTED REINFORCEMENT BARS (P)EACH82$75.00$6,150.00$59.95$4,915.90
2433.602GROUTED REINFORCEMENT BARS (P)EACH32$75.00$2,400.00$59.95$1,918.40
2433.618CONCRETE SURFACE REPAIRS F75$50.00$3,750.00$163.50$12,262.50
2433.618CONCRETE SURFACE REPAIRS F75$50.00$3,750.00$163.50$12,262.50
2433.618CONCRETE SURFACE REPAIRS F75$50.00$3,750.00$163.50$12,262.50
2442.501REMOVE EXISTING BRIDGELS1$48,000.00$48,000.00$21,800.00$21,800.00
2442.501REMOVE EXISTING BRIDGELS1$30,000.00$30,000.00$32,700.00$32,700.00
2442.501REMOVE EXISTING BRIDGELS1$8,000.00$8,000.00$15,805.00$15,805.00
2442.501REMOVE EXISTING BRIDGELS1$30,000.00$30,000.00$30,476.40$30,476.40
2501.51118" CS PIPE CULVERTL F60$44.50$2,670.00$70.85$4,251.00
2501.51518" GS PIPE APRONEACH2$187.00$374.00$463.25$926.50
2502.502DRAINAGE SYSTEM TYPE (B910)LS1$4,000.00$4,000.00$3,052.00$3,052.00
2502.502DRAINAGE SYSTEM TYPE (B910)LS1$4,000.00$4,000.00$3,052.00$3,052.00
2502.502DRAINAGE SYSTEM TYPE (B910)LS1$4,000.00$4,000.00$3,052.00$3,052.00
2545.509CONDUIT SYSTEMLS1$1,500.00$1,500.00$5,450.00$5,450.00
2545.509CONDUIT SYSTEMLS1$1,500.00$1,500.00$5,450.00$5,450.00
2545.509CONDUIT SYSTEMLS1$1,500.00$1,500.00$5,450.00$5,450.00
2554.501TRAFFIC BARRIER DESIGN B8307L F25$31.50$787.50$34.34$858.50
2554.501TRAFFIC BARRIER DESIGN B8338L F738$17.50$12,915.00$19.08$14,081.04
2554.523END TREATMENT- 8307EACH1$550.00$550.00$599.50$599.50
2554.523END TREATMENT- SKT-350EACH10$2,600.00$26,000.00$2,834.00$28,340.00
2554.603THRIE BEAM TRANSITION (MGS)LIN FT440$80.00$35,200.00$87.20$38,368.00
2563.601TRAFFIC CONTROLLS1$4,200.00$4,200.00$4,905.00$4,905.00
2573.502SILT FENCE, TYPE MSL F250$2.25$562.50$5.45$1,362.50
2573.515FILTER BERM TYPE 5L F120$6.00$720.00$43.60$5,232.00
2573.520SEDIMENT REMOVAL BACKHOEHOUR5$100.00$500.00$277.95$1,389.75
2573.533SEDIMENT CONTROL LOG TYPE STRAWL F700$3.50$2,450.00$4.09$2,863.00
2573.533SEDIMENT CONTROL LOG TYPE WOOD FIBERL F300$3.50$1,050.00$4.91$1,473.00
2573.550EROSION CONTROL SUPERVISORLS1$1.00$1.00$8,175.00$8,175.00
2573.602TEMPORARY SEDIMENT TRAPEACH3$150.00$450.00$763.00$2,289.00
2574.508FERTILIZER TYPE 1LB615$1.00$615.00$0.93$571.95
2574.525COMMON TOPSOIL BORROW (P)C Y470$17.50$8,225.00$35.97$16,905.90
2575.501SEEDINGACRE2$650.00$1,300.00$1,308.00$2,616.00
2575.502SEED MIXTURE 25-151LB75$4.00$300.00$13.08$981.00
2575.502SEED MIXTURE 25-142LB51$4.25$216.75$10.90$555.90
2575.523EROSION CONTROL BLANKETS CATEGORY 4NS Y2,250$1.90$4,275.00$4.63$10,417.50
2575.523EROSION CONTROL BLANKETS CATEGORY 3NS Y3,043$1.55$4,716.65$4.20$12,780.60
2575.571RAPID STABILIZATION METHOD 3MGAL8$250.00$2,000.00$735.75$5,886.00
2581.501REMOVABLE PREFORM PAVEMENT MARKING TAPEL F218$4.00$872.00$2.73$595.14
 Totals for project SAP 007-605-015 $885,781.70 $1,032,329.59
 
Contract Total:$885,781.70$1,032,329.59