SAP 07-599-53 - Township Road no. 337, Bridge No. 07547MINNOWA CONSTRUCTION CO. STRUCTURAL SPECIALTIES INC. M-K BRIDGE CONSTRUCTION INC. DUININCK BROTHERS INC 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$20,000.00$20,000.00$25,094.24$25,094.24$33,305.00$33,305.00$4,700.00$4,700.00
2101.502CLEARINGTREE69$40.00$2,760.00$40.00$2,760.00$40.00$2,760.00$40.00$2,760.00
2101.507GRUBBINGTREE44$35.00$1,540.00$35.00$1,540.00$35.00$1,540.00$35.00$1,540.00
2104.501REMOVE FENCELIN FT1,300$1.00$1,300.00$1.00$1,300.00$1.00$1,300.00$1.00$1,300.00
2104.501REMOVE PIPE CULVERTSLIN FT60$5.00$300.00$5.00$300.00$5.00$300.00$5.00$300.00
2105.501COMMON EXCAVATION (P)CU YD1,144$4.00$4,576.00$4.00$4,576.00$4.00$4,576.00$4.00$4,576.00
2118.501AGGREGATE SURFACING CLASS 1 MODTON305$16.50$5,032.50$16.50$5,032.50$16.50$5,032.50$16.50$5,032.50
2211.501AGGREGATE BASE CLASS 5TON240$18.75$4,500.00$18.75$4,500.00$18.75$4,500.00$18.75$4,500.00
2357.502BITUMINOUS MATERIAL FOR TACK COATGALLON60$2.50$150.00$3.75$225.00$3.75$225.00$2.50$150.00
2360.501TYPE SP 19.0 WEARING COURSE MIXTURE (2,B)TON172$81.00$13,932.00$95.00$16,340.00$95.00$16,340.00$81.00$13,932.00
2401.601SLOPE PREPARATIONLUMP SUM1$4,000.00$4,000.00$6,608.00$6,608.00$6,000.00$6,000.00$1,250.00$1,250.00
2401.601STRUCTURE EXCAVATIONLUMP SUM1$15,000.00$15,000.00$12,350.24$12,350.24$13,000.00$13,000.00$9,500.00$9,500.00
2402.521STRUCTURAL STEEL (3306) (P)POUND9,080$4.00$36,320.00$2.96$26,876.80$3.00$27,240.00$4.08$37,046.40
2402.584STRUCTURAL TUBE RAILING DESIGN SPECIAL (P)LIN FT127$110.00$13,970.00$125.03$15,878.81$160.00$20,320.00$110.00$13,970.00
2402.590ELASTOMERIC BEARING PAD TYPE 1 (P)EACH16$100.00$1,600.00$54.91$878.56$75.00$1,200.00$50.00$800.00
2405.603PRESTRESSED CONCRETE BOX BEAMS 27X48 (P)LIN FT462$400.00$184,800.00$353.54$163,335.48$400.00$184,800.00$496.50$229,383.00
2442.501REMOVE EXISTING BRIDGELUMP SUM1$8,000.00$8,000.00$18,000.00$18,000.00$15,000.00$15,000.00$14,500.00$14,500.00
2452.507C-I-P CONCRETE PILING DELIVERED 12"LIN FT400$35.00$14,000.00$29.66$11,864.00$25.00$10,000.00$29.00$11,600.00
2452.508C-I-P CONCRETE PILING DRIVEN 12"LIN FT400$1.00$400.00$1.00$400.00$1.00$400.00$1.00$400.00
2452.519C-I-P CONCRETE TEST PILE 60 FT LONG 12"EACH2$6,000.00$12,000.00$7,586.88$15,173.76$7,500.00$15,000.00$4,900.00$9,800.00
2452.602PILE TIP PROTECTION 12"EACH10$200.00$2,000.00$156.80$1,568.00$200.00$2,000.00$175.00$1,750.00
2452.618STEEL SHEET PILING (PERMANENT) (P)SQ FT966$30.00$28,980.00$55.45$53,564.70$35.00$33,810.00$55.00$53,130.00
2481.501JOINT WATERPROOFINGLIN FT408$4.00$1,632.00$8.96$3,655.68$3.00$1,224.00$10.00$4,080.00
2501.51118" CS PIPE CULVERTLIN FT36$19.00$684.00$19.00$684.00$19.00$684.00$19.00$684.00
2501.51518" GS PIPE APRONEACH2$120.00$240.00$120.00$240.00$120.00$240.00$120.00$240.00
2502.601DRAINAGE SYSTEM TYPE (B911)LUMP SUM1$2,000.00$2,000.00$1,008.00$1,008.00$1,000.00$1,000.00$1,300.00$1,300.00
2511.501RANDOM RIPRAP CLASS IIICU YD24$60.00$1,440.00$60.00$1,440.00$60.00$1,440.00$60.00$1,440.00
2511.501RANDOM RIPRAP CLASS IIICU YD210$70.00$14,700.00$60.00$12,600.00$50.00$10,500.00$60.00$12,600.00
2573.502SILT FENCE, TYPE HEAVY DUTYLIN FT92$3.03$278.76$3.03$278.76$3.03$278.76$3.03$278.76
2573.502SILT FENCE, TYPE MACHINE SLICEDLIN FT274$2.00$548.00$2.00$548.00$2.00$548.00$2.00$548.00
2573.505FLOTATION SILT CURTAIN TYPE MOVING WATERLIN FT90$11.00$990.00$11.00$990.00$11.00$990.00$11.00$990.00
2573.512TEMPORARY DITCH CHECK TYPE 2LIN FT108$4.37$471.96$4.37$471.96$4.37$471.96$4.37$471.96
2573.513TEMPORARY DITCH CHECK TYPE 7CU YD13$2.87$37.31$2.87$37.31$2.87$37.31$100.00$1,300.00
2573.520SEDIMENT REMOVAL BACKHOEHOUR4$150.00$600.00$150.00$600.00$150.00$600.00$150.00$600.00
2573.540FILTER LOG TYPE STRAW BIOROLLLIN FT183$2.87$525.21$2.87$525.21$2.87$525.21$2.87$525.21
2573.550EROSION CONTROL SUPERVISORLUMP SUM1$1,750.00$1,750.00$1,750.00$1,750.00$1,750.00$1,750.00$1,750.00$1,750.00
2573.602TEMPORARY SEDIMENT TRAPEACH4$650.00$2,600.00$650.00$2,600.00$650.00$2,600.00$650.00$2,600.00
2575.523EROSION CONTROL BLANKETS CATEGORY 4SQ YD175$1.65$288.75$1.65$288.75$1.65$288.75$1.65$288.75
2575.555TURF ESTABLISHMENTLUMP SUM1$1,800.00$1,800.00$1,800.00$1,800.00$1,800.00$1,800.00$1,800.00$1,800.00
2575.560HYDRAULIC SOIL STABILIZER TYPE 5POUND750$1.00$750.00$1.00$750.00$1.00$750.00$1.00$750.00
 Totals for project SAP 07-599-53 $406,496.49 $418,433.76 $424,376.49 $454,166.58
 
SAP 07-598-27 - C.R. 164 (BRIDGE NO. 07593)MINNOWA CONSTRUCTION CO. STRUCTURAL SPECIALTIES INC. M-K BRIDGE CONSTRUCTION INC. DUININCK BROTHERS INC 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$20,000.00$20,000.00$25,892.48$25,892.48$39,305.23$39,305.23$26,600.00$26,600.00
2101.502CLEARINGTREE177$75.00$13,275.00$75.00$13,275.00$75.00$13,275.00$75.00$13,275.00
2101.507GRUBBINGTREE150$50.00$7,500.00$50.00$7,500.00$50.00$7,500.00$50.00$7,500.00
2104.501REMOVE PIPE CULVERTSLIN FT44$5.00$220.00$5.00$220.00$5.00$220.00$5.00$220.00
2104.501REMOVE FENCELIN FT986$1.00$986.00$1.00$986.00$1.00$986.00$1.00$986.00
2104.501REMOVE GUARD RAILLIN FT452$5.50$2,486.00$5.50$2,486.00$5.50$2,486.00$5.50$2,486.00
2105.501COMMON EXCAVATION (P)CU YD1,628$4.00$6,512.00$4.00$6,512.00$4.00$6,512.00$4.00$6,512.00
2105.523COMMON BORROW (EV)CU YD10,000$5.00$50,000.00$5.00$50,000.00$5.00$50,000.00$5.00$50,000.00
2105.535SALVAGED TOPSOIL (EV)CU YD2,500$4.00$10,000.00$4.00$10,000.00$4.00$10,000.00$4.00$10,000.00
2105.550SUBSOILINGACRE5$500.00$2,500.00$500.00$2,500.00$500.00$2,500.00$500.00$2,500.00
2118.501AGGREGATE SURFACING CLASS 1 MODTON1,105$16.50$18,232.50$16.50$18,232.50$16.50$18,232.50$16.50$18,232.50
2211.501AGGREGATE BASE CLASS 5TON240$18.75$4,500.00$18.75$4,500.00$18.75$4,500.00$18.75$4,500.00
2357.502BITUMINOUS MATERIAL FOR TACK COATGALLON37$2.50$92.50$4.20$155.40$3.75$138.75$2.50$92.50
2357.502BITUMINOUS MATERIAL FOR TACK COATGALLON30$2.50$75.00$3.75$112.50$3.75$112.50$2.50$75.00
2360.501TYPE SP 19.0 WEARING COURSE MIXTURE (2,B)TON41$115.00$4,715.00$105.28$4,316.48$94.00$3,854.00$115.00$4,715.00
2360.501TYPE SP 19.0 WEARING COURSE MIXTURE (2,B)TON140$81.00$11,340.00$94.00$13,160.00$94.00$13,160.00$81.00$11,340.00
2401.601SLOPE PREPARATIONLUMP SUM1$5,000.00$5,000.00$3,608.00$3,608.00$6,000.00$6,000.00$1,250.00$1,250.00
2401.601STRUCTURE EXCAVATIONLUMP SUM1$15,000.00$15,000.00$12,350.24$12,350.24$13,000.00$13,000.00$10,300.00$10,300.00
2402.521STRUCTURAL STEEL (3306) (P)POUND8,960$4.00$35,840.00$2.96$26,521.60$3.00$26,880.00$4.08$36,556.80
2402.584STRUCTURAL TUBE RAILING DESIGN SPECIAL (P)LIN FT136$110.00$14,960.00$125.03$17,004.08$160.00$21,760.00$110.00$14,960.00
2402.590ELASTOMERIC BEARING PAD TYPE 1 (P)EACH18$100.00$1,800.00$54.91$988.38$75.00$1,350.00$50.00$900.00
2405.603PRESTRESSED CONCRETE BOX BEAMS 27X48 (P)LIN FT560$400.00$224,000.00$345.96$193,737.60$400.00$224,000.00$452.50$253,400.00
2442.501REMOVE EXISTING BRIDGELUMP SUM1$15,000.00$15,000.00$23,600.00$23,600.00$15,000.00$15,000.00$19,000.00$19,000.00
2452.507C-I-P CONCRETE PILING DELIVERED 12"LIN FT640$35.00$22,400.00$29.66$18,982.40$25.00$16,000.00$29.00$18,560.00
2452.508C-I-P CONCRETE PILING DRIVEN 12"LIN FT640$1.00$640.00$1.00$640.00$1.00$640.00$1.00$640.00
2452.519C-I-P CONCRETE TEST PILE 90 FT LONG 12"EACH2$9,000.00$18,000.00$7,586.88$15,173.76$9,000.00$18,000.00$7,600.00$15,200.00
2452.602PILE TIP PROTECTION 12"EACH10$200.00$2,000.00$156.80$1,568.00$200.00$2,000.00$175.00$1,750.00
2452.618STEEL SHEET PILING (PERMANENT) (P)SQ FT972$30.00$29,160.00$55.43$53,877.96$35.00$34,020.00$55.00$53,460.00
2481.501JOINT WATERPROOFINGLIN FT518$4.00$2,072.00$8.96$4,641.28$3.00$1,554.00$10.00$5,180.00
2501.51118" CS PIPE CULVERTLIN FT42$19.00$798.00$19.00$798.00$19.00$798.00$19.00$798.00
2501.51518" GS PIPE APRONEACH2$120.00$240.00$120.00$240.00$120.00$240.00$120.00$240.00
2502.601DRAINAGE SYSTEM TYPE (B911)LUMP SUM1$2,000.00$2,000.00$1,008.00$1,008.00$1,000.00$1,000.00$1,300.00$1,300.00
2511.501RANDOM RIPRAP CLASS IIICU YD10$60.00$600.00$60.00$600.00$60.00$600.00$60.00$600.00
2511.501RANDOM RIPRAP CLASS IIICU YD216$70.00$15,120.00$60.00$12,960.00$50.00$10,800.00$60.00$12,960.00
2573.502SILT FENCE, TYPE HEAVY DUTYLIN FT327$3.03$990.81$3.03$990.81$3.03$990.81$3.03$990.81
2573.502SILT FENCE, TYPE MACHINE SLICEDLIN FT792$2.00$1,584.00$2.00$1,584.00$2.00$1,584.00$2.00$1,584.00
2573.505FLOTATION SILT CURTAIN TYPE MOVING WATERLIN FT90$11.00$990.00$11.00$990.00$11.00$990.00$11.00$990.00
2573.512TEMPORARY DITCH CHECK TYPE 2LIN FT195$4.37$852.15$4.37$852.15$4.37$852.15$4.37$852.15
2573.513TEMPORARY DITCH CHECK TYPE 7CU YD5$100.00$500.00$100.00$500.00$100.00$500.00$100.00$500.00
2573.520SEDIMENT REMOVAL BACKHOEHOUR3$150.00$450.00$150.00$450.00$150.00$450.00$150.00$450.00
2573.540FILTER LOG TYPE STRAW BIOROLLLIN FT327$2.87$938.49$2.87$938.49$2.87$938.49$2.87$938.49
2573.550EROSION CONTROL SUPERVISORLUMP SUM1$1,750.00$1,750.00$1,750.00$1,750.00$1,750.00$1,750.00$1,750.00$1,750.00
2573.602TEMPORARY SEDIMENT TRAPEACH3$650.00$1,950.00$650.00$1,950.00$650.00$1,950.00$650.00$1,950.00
2575.501SEEDINGACRE4$300.00$1,200.00$300.00$1,200.00$300.00$1,200.00$300.00$1,200.00
2575.502SEED MIXTURE 150POUND36$2.55$91.80$2.55$91.80$2.55$91.80$2.55$91.80
2575.502SEED MIXTURE 280POUND148$2.76$408.48$2.76$408.48$2.76$408.48$2.76$408.48
2575.511MULCH MATERIAL TYPE 1TON8$142.00$1,136.00$142.00$1,136.00$142.00$1,136.00$142.00$1,136.00
2575.519DISK ANCHORINGACRE4$75.00$300.00$75.00$300.00$75.00$300.00$75.00$300.00
2575.523EROSION CONTROL BLANKETS CATEGORY 4SQ YD1,224$1.65$2,019.60$1.65$2,019.60$1.65$2,019.60$1.65$2,019.60
2575.532COMMERCIAL FERTILIZER ANALYSIS 20-10-20POUND1,037$0.60$622.20$0.60$622.20$0.60$622.20$0.60$622.20
2575.560HYDRAULIC SOIL STABILIZER TYPE 5POUND750$1.00$750.00$1.00$750.00$1.00$750.00$1.00$750.00
 Totals for project SAP 07-598-27 $573,597.53 $564,681.19 $582,957.51 $622,622.33
 
Contract Total:$980,094.02$983,114.95$1,007,334.00$1,076,788.91