Contract Bid Abstract

SAP 07-626-15 - CSAH 26 Eagle Lake Segment OverburdenBRUNZ CONSTRUCTION CO., INC. BORNEKE CONSTRUCTION CO. Rachel Contracting, Inc Mathiowetz Construction Co. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2101.502CLEARINGTREE4$200.00$800.00$85.00$340.00$430.00$1,720.00$200.00$800.00
2104.501REMOVE PIPE CULVERTSLIN FT74$4.00$296.00$7.00$518.00$7.65$566.10$6.00$444.00
2104.501REMOVE PIPE DRAINLIN FT1,265$2.00$2,530.00$2.50$3,162.50$7.65$9,677.25$4.00$5,060.00
2104.501REMOVE FENCELIN FT185$4.00$740.00$2.50$462.50$7.65$1,415.25$1.00$185.00
2105.501COMMON EXCAVATION (P)CU YD51,627$3.35$172,950.45$3.30$170,369.10$5.52$284,981.04$5.75$296,855.25
2105.522SELECT GRANULAR BORROW (CV)CU YD6,363$13.00$82,719.00$14.50$92,263.50$15.52$98,753.76$19.15$121,851.45
2105.602SETTLEMENT PLATESEACH2$250.00$500.00$500.00$1,000.00$470.00$940.00$150.00$300.00
2105.602PNEUMATIC PIEZOMETEREACH2$2,400.00$4,800.00$2,500.00$5,000.00$3,019.00$6,038.00$2,750.00$5,500.00
2105.604GEOTEXTILE FABRIC TYPE VI ASQ YD13,128$4.54$59,601.12$5.75$75,486.00$6.95$91,239.60$7.60$99,772.80
2118.501AGGREGATE SURFACING CLASS 1 MODTON530$15.75$8,347.50$18.00$9,540.00$17.25$9,142.50$14.00$7,420.00
2118.501AGGREGATE SURFACING CLASS 2 MODIFIEDTON30$35.00$1,050.00$25.00$750.00$65.70$1,971.00$40.00$1,200.00
2501.51118" CS PIPE CULVERTLIN FT80$16.00$1,280.00$25.00$2,000.00$33.40$2,672.00$21.50$1,720.00
2501.51124" CS PIPE CULVERTLIN FT64$20.00$1,280.00$27.00$1,728.00$32.80$2,099.20$29.00$1,856.00
2501.51124" RC PIPE CULVERT CLASS IIILIN FT60$44.00$2,640.00$47.00$2,820.00$50.50$3,030.00$44.00$2,640.00
2501.51136" CS PIPE CULVERTLIN FT200$34.00$6,800.00$39.00$7,800.00$48.15$9,630.00$45.00$9,000.00
2501.51524" RC PIPE APRONEACH2$400.00$800.00$650.00$1,300.00$959.00$1,918.00$574.00$1,148.00
2501.51518" GS PIPE APRONEACH4$150.00$600.00$150.00$600.00$412.00$1,648.00$109.00$436.00
2501.51524" GS PIPE APRONEACH2$180.00$360.00$175.00$350.00$459.00$918.00$140.00$280.00
2502.52112" PE PIPE DRAINLIN FT500$12.00$6,000.00$10.00$5,000.00$20.22$10,110.00$12.75$6,375.00
2502.5216" TP PIPE DRAINLIN FT690$13.25$9,142.50$12.50$8,625.00$16.40$11,316.00$15.00$10,350.00
2502.5218" TP PIPE DRAINLIN FT270$15.00$4,050.00$15.50$4,185.00$18.50$4,995.00$16.50$4,455.00
2502.52112" TP PIPE DRAINLIN FT120$18.00$2,160.00$19.00$2,280.00$24.75$2,970.00$21.00$2,520.00
2502.5418" PERF PE PIPE DRAINLIN FT480$9.00$4,320.00$7.00$3,360.00$18.20$8,736.00$8.35$4,008.00
2502.601PIPE DRAIN RISER 8" PEEACH1$325.00$325.00$400.00$400.00$303.00$303.00$242.00$242.00
2573.502SILT FENCE, TYPE MACHINE SLICEDLIN FT1,000$1.55$1,550.00$2.00$2,000.00$2.14$2,140.00$1.78$1,780.00
2573.502SILT FENCE, TYPE HEAVY DUTYLIN FT350$2.55$892.50$3.50$1,225.00$3.60$1,260.00$3.00$1,050.00
2573.512TEMPORARY DITCH CHECK TYPE 2LIN FT625$2.45$1,531.25$2.80$1,750.00$3.00$1,875.00$2.45$1,531.25
2573.513TEMPORARY DITCH CHECK TYPE 7CU YD10$275.00$2,750.00$85.00$850.00$558.00$5,580.00$60.00$600.00
2573.520SEDIMENT REMOVAL BACKHOEHOUR20$150.00$3,000.00$125.00$2,500.00$160.00$3,200.00$175.00$3,500.00
2573.530STORM DRAIN INLET PROTECTIONEACH2$245.00$490.00$200.00$400.00$130.00$260.00$250.00$500.00
2573.540FILTER LOG TYPE STRAW BIOROLLLIN FT1,000$2.45$2,450.00$2.50$2,500.00$2.94$2,940.00$2.45$2,450.00
2573.550EROSION CONTROL SUPERVISORLUMP SUM1$2,500.00$2,500.00$1,000.00$1,000.00$2,300.00$2,300.00$3,500.00$3,500.00
2573.602TEMPORARY SEDIMENT TRAPEACH2$275.00$550.00$300.00$600.00$230.00$460.00$500.00$1,000.00
2575.501SEEDINGACRE20$75.00$1,500.00$100.00$2,000.00$110.00$2,200.00$174.50$3,490.00
2575.502SEED MIXTURE 150POUND377$1.95$735.15$2.00$754.00$2.60$980.20$2.15$810.55
2575.502SEED MIXTURE 280POUND707$2.15$1,520.05$3.50$2,474.50$3.00$2,121.00$2.53$1,788.71
2575.511MULCH MATERIAL TYPE 1TON39$140.00$5,460.00$125.00$4,875.00$155.00$6,045.00$129.00$5,031.00
2575.519DISK ANCHORINGACRE20$45.00$900.00$50.00$1,000.00$78.00$1,560.00$65.00$1,300.00
2575.523EROSION CONTROL BLANKETS CATEGORY 4SQ YD5,322$1.45$7,716.90$1.25$6,652.50$1.70$9,047.40$1.42$7,557.24
2575.532COMMERCIAL FERTILIZER ANALYSIS 20-10-20POUND3,535$0.45$1,590.75$0.50$1,767.50$0.90$3,181.50$0.74$2,615.90
2575.560HYDRAULIC SOIL STABILIZER TYPE 5POUND6,000$0.81$4,860.00$0.75$4,500.00$1.20$7,200.00$1.00$6,000.00
 Totals for project SAP 07-626-15 $414,088.17 $436,188.10 $619,139.80 $628,923.15
 
Contract Total:$414,088.17$436,188.10$619,139.80$628,923.15