SAP 07-626-11 - CSAH 26 Geotextile & OverloadMathiowetz Construction Co. MIDWEST CONTRACTING, LLC OMG Midwest Inc. dba Minnesota Paving & Materials HOLTMEIER CONSTRUCTION, INC. VEIT & COMPANY, INC. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2101.502CLEARINGTREE29$75.00$2,175.00$100.00$2,900.00$100.00$2,900.00$175.00$5,075.00$170.00$4,930.00
2101.507GRUBBINGTREE6$75.00$450.00$100.00$600.00$100.00$600.00$175.00$1,050.00$170.00$1,020.00
2104.501REMOVE PIPE CULVERTSLIN FT489$7.00$3,423.00$5.00$2,445.00$3.55$1,735.95$5.00$2,445.00$12.00$5,868.00
2104.501REMOVE FENCELIN FT1,245$1.00$1,245.00$0.50$622.50$0.90$1,120.50$2.00$2,490.00$2.80$3,486.00
2104.505REMOVE BITUMINOUS PAVEMENTSQ YD60$3.00$180.00$2.00$120.00$3.00$180.00$6.00$360.00$7.00$420.00
2104.513SAWING BITUMINOUS PAVEMENT (FULL DEPTH)LIN FT96$4.00$384.00$3.00$288.00$2.00$192.00$4.00$384.00$3.00$288.00
2105.501COMMON EXCAVATION (P)CU YD56,073$3.00$168,219.00$2.75$154,200.75$3.36$188,405.28$3.08$172,704.84$3.84$215,320.32
2105.522SELECT GRANULAR BORROW (CV)CU YD16,277$9.50$154,631.50$14.25$231,947.25$11.75$191,254.75$12.00$195,324.00$15.00$244,155.00
2105.523COMMON BORROW (EV)CU YD64,605$3.00$193,815.00$2.88$186,062.40$3.30$213,196.50$2.90$187,354.50$3.35$216,426.75
2105.533SALVAGED AGGREGATE (EV) (P)CU YD4,244$3.50$14,854.00$2.50$10,610.00$4.35$18,461.40$8.00$33,952.00$3.35$14,217.40
2105.535SALVAGED TOPSOIL (EV)CU YD14,589$1.80$26,260.20$1.95$28,448.55$1.67$24,363.63$3.10$45,225.90$2.75$40,119.75
2105.550SUBSOILINGACRE11$150.00$1,650.00$75.00$825.00$53.00$583.00$100.00$1,100.00$500.00$5,500.00
2105.602PNEUMATIC PIEZOMETEREACH5$1,000.00$5,000.00$1,200.00$6,000.00$1,060.00$5,300.00$1,300.00$6,500.00$1,500.00$7,500.00
2105.602SETTLEMENT PLATESEACH6$300.00$1,800.00$485.00$2,910.00$300.00$1,800.00$250.00$1,500.00$600.00$3,600.00
2105.604GEOTEXTILE FABRIC TYPE VI ASQ YD18,678$6.35$118,605.30$7.00$130,746.00$7.28$135,975.84$6.90$128,878.20$7.25$135,415.50
2105.604GEOTEXTILE FABRIC TYPE VI BSQ YD18,806$3.43$64,504.58$3.45$64,880.70$3.82$71,838.92$3.85$72,403.10$3.60$67,701.60
2118.501AGGREGATE SURFACING CLASS 1 MODTON1,090$10.50$11,445.00$12.00$13,080.00$8.80$9,592.00$11.00$11,990.00$15.50$16,895.00
2118.501AGGREGATE SURFACING CLASS 2 MODTON70$20.00$1,400.00$15.00$1,050.00$15.90$1,113.00$11.00$770.00$48.00$3,360.00
2221.501AGGREGATE SHOULDERING CLASS 1 MODTON760$15.00$11,400.00$12.00$9,120.00$11.10$8,436.00$12.00$9,120.00$23.00$17,480.00
2232.501MILL BITUMINOUS SURFACE (6.0")SQ YD7,173$2.70$19,367.10$2.80$20,084.40$2.25$16,139.25$2.17$15,565.41$2.35$16,856.55
2501.51136" CS PIPE CULVERTLIN FT274$40.50$11,097.00$45.00$12,330.00$52.00$14,248.00$45.00$12,330.00$66.00$18,084.00
2501.51124" CS PIPE CULVERTLIN FT62$23.00$1,426.00$33.00$2,046.00$27.90$1,729.80$28.00$1,736.00$54.00$3,348.00
2501.51118" CS PIPE CULVERTLIN FT350$18.50$6,475.00$18.00$6,300.00$25.00$8,750.00$25.00$8,750.00$38.00$13,300.00
2501.51518" GS PIPE APRONEACH16$115.00$1,840.00$95.00$1,520.00$150.00$2,400.00$150.00$2,400.00$785.00$12,560.00
2573.501BALE BARRIERLIN FT2,000$3.20$6,400.00$3.00$6,000.00$3.00$6,000.00$3.00$6,000.00$3.50$7,000.00
2573.502SILT FENCE, TYPE PREASSEMBLED MAINTAINEDLIN FT150$1.50$225.00$2.25$337.50$2.25$337.50$2.25$337.50$1.80$270.00
2573.502SILT FENCE, TYPE MACHINE SLICEDLIN FT2,000$1.75$3,500.00$1.90$3,800.00$1.90$3,800.00$1.90$3,800.00$2.00$4,000.00
2573.502SILT FENCE, TYPE HEAVY DUTYLIN FT2,000$2.48$4,960.00$2.80$5,600.00$2.80$5,600.00$2.78$5,560.00$2.50$5,000.00
2573.512TEMPORARY DITCH CHECK TYPE 3LIN FT280$3.75$1,050.00$5.00$1,400.00$5.00$1,400.00$4.97$1,391.60$4.00$1,120.00
2573.512TEMPORARY DITCH CHECK TYPE 1LIN FT500$1.60$800.00$2.35$1,175.00$2.35$1,175.00$2.35$1,175.00$3.00$1,500.00
2573.540FILTER LOG TYPE STRAW BIOROLLLIN FT2,000$2.75$5,500.00$3.80$7,600.00$3.80$7,600.00$3.78$7,560.00$3.00$6,000.00
2573.550EROSION CONTROL SUPERVISORLUMP SUM1$5,000.00$5,000.00$3,500.00$3,500.00$4,025.00$4,025.00$5,800.00$5,800.00$5,000.00$5,000.00
2575.501SEEDINGACRE25$95.00$2,375.00$65.00$1,625.00$65.00$1,625.00$65.00$1,625.00$100.00$2,500.00
2575.502SEED MIXTURE 100POUND800$0.40$320.00$0.50$400.00$0.50$400.00$0.50$400.00$0.50$400.00
2575.502SEED MIXTURE 280POUND385$1.95$750.75$2.20$847.00$2.20$847.00$2.18$839.30$2.00$770.00
2575.502SEED MIXTURE 150POUND388$1.50$582.00$2.00$776.00$2.05$795.40$2.02$783.76$1.60$620.80
2575.505SODDING TYPE EROSIONSQ YD4,126$2.75$11,346.50$2.40$9,902.40$2.40$9,902.40$2.39$9,861.14$3.10$12,790.60
2575.511MULCH MATERIAL TYPE 1TON50$125.00$6,250.00$95.00$4,750.00$95.00$4,750.00$95.00$4,750.00$120.00$6,000.00
2575.519DISK ANCHORINGACRE17$75.00$1,275.00$68.00$1,156.00$68.00$1,156.00$68.00$1,156.00$8.00$136.00
2575.532COMMERCIAL FERTILIZER ANALYSIS 20-10-20POUND5,950$0.35$2,082.50$0.30$1,785.00$0.30$1,785.00$0.30$1,785.00$0.50$2,975.00
 Totals for project SAP 07-626-11 $874,063.43 $939,790.45 $971,514.12 $972,232.25 $1,123,934.27
 
Contract Total:$874,063.43$939,790.45$971,514.12$972,232.25$1,123,934.27