Bidder Question Common Excavation Plan Quantity

Q1: What typical section was assumed in calculation of the Common Excavation (P) Plan quantity?

A1: The consultant design Engineer stated that they assumed the amount of bituminous milled would be minimal. The Common Excavation Quantity for the project was calculated from top of existing ground to bottom of proposed grade. The Common Excavation quantity included the inplace aggregate base.